Industrial RFID Supply Chain Control Tower • ISO 18000-6C Gen2
12-Stage Operational Linen Lifecycle • Clockwise Closed-Loop Digital Twin
FLEET MASS BALANCE:
51,800 pcs
IJN Hospital ↔ Astana Plant
Facility Perspective:
SLCF: 6
CLDN: 8
RRF: 2
⚖️ 4 Scales Active
42 pcs drift (0.08%)
Dwell Time per Zone (Hours)
⋮
Wash Plant
Transit
Hospital
0
5
10
15
20
25
Unit Turnaround Time vs 24h SLA
⋮24h SLA
Average Turnaround: 18.4 Hours (≤ 24h Contract Target)
Daily Linen Circulation Balance
24h Shift Outbound Dispatched vs Inbound Received
5,539
-
5,534
Outbound Dispatched (24h)
Inbound Received (24h)
Δ 5 Missing Units (0.09% Variance • 99.91% Reconciliation)
📦 Live Dock Staging: Outbound 3,200 pcs • Inbound 900 pcs
⚡ Closed-Loop Fleet Balance: 51,800 pcs (Equilibrium)